Stronger Shelters. Smarter Solutions.
PEB Building Manufacturer in India

Custom Pre-Engineered Buildings, Engineered for India's Industries

Warehouses, factories, multi-storey steel structures, and light gauge framing, delivered Pan India with 22+ years of engineering precision. 30–40% faster than RCC.

IS 800 / IS 875 / IS 1893 Compliant Design
In-House Fabrication & Quality Control
Faster Delivery: 4–6 Months for 50,000 sq ft
Mezzanine, Crane Beam & EOT-Ready

Get a Free PEB Quote

Our engineering team responds within 24 hours.

By submitting, you agree to our privacy policy. We respect your data and never spam.

22+
Years PEB Experience
Pan India
Project Execution
In-House
Steel Fabrication
IS 800
Code-Compliant Design

Trusted by Leading Organizations

PEB Solutions We Deliver

Four Engineered PEB Configurations

From single-span warehouses to multi-storey steel structures, we engineer to your operational scale, industry requirements, and future expansion plans.

Pre-Engineered Ordinary Steel Building under construction

Pre-Engineered Ordinary Steel Buildings

Single-span warehouses and factories with clear-span flexibility, ideal for logistics, manufacturing, and storage.

PEB with Mezzanine Floor

PEB with Mezzanine Floor

Doubled usable area with engineered mezzanines for offices, storage, packaging or production lines.

Multi-Storey PEB structure

Multi-Storey PEB

Steel-framed multi-level structures for industrial, commercial, and institutional buildings up to 4–6 floors.

Light Gauge Steel Framing

Light Gauge Steel Framing

Cold-formed steel framing systems for modular, residential, and light-load industrial applications.

Why Shelter Max for PEB

Engineering Discipline. Fabrication Capability. Execution Speed.

In-House Fabrication

Owned cutting, welding, drilling and surface treatment, no vendor delays.

IS-Compliant Engineering

STAAD Pro structural analysis, IS 800/875/1893 design, BOQ + drawings before fab.

30–40% Faster Than RCC

Pre-fabrication + parallel site work = warehouses delivered in 4–6 months.

Pan India Delivery

Logistics network covering 20+ Indian states with full trip insurance.

Mezzanine + Crane Beam Ready

EOT crane brackets, mezzanine joists, and future-expansion provisions on request.

22+ Years Track Record

Proven execution for pharma, auto, FMCG, logistics, and government clients.

Have a PEB project in mind? Get an engineering consultation, free.

Call +91 93544 00654
PEB vs Conventional RCC

Why PEB Is the Smarter Choice for Industrial Construction

A side-by-side comparison of Pre-Engineered Buildings vs traditional RCC construction across the parameters that matter for industrial buyers.

Parameter PEB (Pre-Engineered Building) Conventional RCC
Construction Time 4–6 months (50,000 sq ft) 12–18 months
Cost per Sq Ft Lower (optimized steel usage) Higher (concrete + reinforcement)
Foundation Load Lighter, smaller foundations Heavier, deep foundations required
Design Flexibility High customisation, clear spans up to 90m Limited by columns & structural grid
Future Expansion Modular, bolt-on extensions Complex, major rework required
Quality Control Factory-controlled, batch QC Site-dependent, weather-sensitive
Maintenance Minimal, periodic re-painting Periodic, crack repair, water-proofing
Recyclability 100% recyclable steel Limited, concrete debris
Seismic Performance Excellent (high ductility) Good (with proper design)
Design Lifespan 30–50+ years 30–50+ years
PEB Applications

Industries & Use Cases We Engineer For

Warehouses & Logistics
Manufacturing Plants
Cold Storage
Commercial Buildings
Multi-Storey Steel
Workshops & Sheds
Our PEB Delivery Process

From Inquiry to Handover, 4 Engineering-Led Steps

01

Requirement Analysis

Site visit, load assessment, span planning, and budget alignment within 7 days.

02

Engineering & Design

STAAD Pro analysis, IS-code design, BOQ, foundation drawings in 14–21 days.

03

Fabrication & QC

In-house cutting, welding, drilling, and surface treatment with batch QC.

04

Erection & Handover

On-site erection by trained crews, final inspection, and project handover.

PEB FAQs

Common Questions About PEB Buildings

A PEB is a steel structure where columns, rafters, purlins, and panels are designed and fabricated in a factory to precise engineering specifications, then transported to site for rapid bolt-up assembly. PEBs deliver 30–40% faster than conventional RCC construction with greater design flexibility and lower lifetime costs.
PEB cost typically ranges from ₹350–600 per sq ft for basic warehouse structures and ₹700–1,200 per sq ft for premium specifications. Final cost depends on clear span, eave height, cladding type, insulation, mezzanine inclusion, crane provisions, and project location. For a precise quote, share your sq ft and intended use, we'll send a structured BOQ within 24 hours.
A standard 50,000–80,000 sq ft PEB warehouse takes 4–6 months end-to-end, from design lock to on-site handover. Smaller industrial sheds (5,000–15,000 sq ft) can be delivered in 8–12 weeks. Multi-storey PEB and projects with crane beams add 1–2 months due to additional engineering complexity.
PEB uses pre-fabricated steel components assembled on site. RCC uses cast-in-place concrete with steel reinforcement. PEB is 30–40% faster, allows wider clear spans (no internal columns up to 90m), has lighter foundations, is easier to expand, and is fully recyclable. RCC has higher thermal mass but is slower, more weather-sensitive during construction, and harder to modify post-handover. See our full comparison table above.
Yes. Multi-storey PEB is well-suited for industrial and commercial buildings up to 4–6 floors. Mezzanine floors are a common addition for warehousing, packaging, or office space within the same building footprint. Multi-storey PEB delivers usable area at a fraction of RCC's construction time and footprint.
We use IS 2062 (E250 / E350) structural steel for primary members and IS 811 light gauge cold-formed steel for secondary framing. All steel is sourced from primary Indian steel producers. Surface treatment options include sandblasting + primer + epoxy coating, hot-dip galvanising for coastal/chemical environments, and powder coating for visible elements. Specifications are tuned to your site conditions.

Ready to build your PEB project?

Get an engineering consultation, indicative BOQ, and project timeline, within 24 hours of inquiry.

Call +91 93544 00654
Chat With Us
Call WhatsApp